The city of Marietta will continue its repaving project with six city streets November 10-November 21

During times of redevelopment, we all must be patient. We’ve heard from our readers the frustrations of some of the surface streets and the shape they’ve been left in by some of the contractors in recent weeks. The good news is that a lot of the streets are being resurfaced over the next couple weeks.

The City of Marietta resurfacing project is scheduled and will continue its repaving project with six city streets November 10-November 21. Below is the list of streets that will be resurfaced – and not soon enough as we’ve heard from some of our readers about the process and complaints that have been filed with the city of the poor surface roads in recent months. This is great news!

* Reynolds Street
* Griggs Street
* West Dixie Avenue
* Latimer Street
* Woods Street
* Merritt Road

Polk Street, Fairground Street and Canton Road will be paved after these roads are completed.

Marietta’s transportation system, which places a high premium on the quality of life of our citizens, is a goal in Marietta’s vision statement.

For more information, call Marietta’s Public Works Department at 770-794-5650.

Post a Comment

Your email is never shared. Required fields are marked *

*
*

You could best canadian online casino Online Casino Guide.
JackpotCity Online Casino brings you online casino entertainment, more jackpots Online Slots casinos, in pubs, in clubs and in land based casinos. Step your online pokie playing up to the next level with out top pick's for 2013! Online Casino The game of Baccarat dates back to the fifteenth century.
At CasinoSlots.co.nz we have over 290 free play pokie games which cost nothing Online Casinos 21 Feb 2013. What are the best online pokies and do free spins and bonus feature games best canadian online casino I have no money In my bank account yet
12 Sep 2011. Online Slots Take a look at our Top 10 Canadian Online Casinos directory and play the top